Completed installation of 2.36kWp 5kva Hybrid Offgrid Solar Power
Used to supply the following load:
✅1hp split type aircon
✅electric stove
✅washing machine
✅electric kettle
✅TV
✅led lights
✅rice cooker
✅mobile and laptop charging
Completed installation of 2.36kWp 5kva Hybrid Offgrid Solar Power