Some basic quick shelves. It is amazing how short the build time was and how long the finishing time was.
This took 1.5 hours.
This took 2 days!!!
I love making things and I love the way it looks in the end but I hate the little nite picky things that goes into a order pice. But it what makes it look better and now I got a spray gun so I should be able to cut that time in haft.
I'll be installing them next week some time.