Well its the moment that you've been waiting for (ha not really), its time for an update on our home renovation. We are finishing week 9 of 14 and so far everything is still on track and on schedule for the project. The past few weeks have been mostly about the tiling work, but a few other things have happened as well so lets get into it.
Firstly we had a bunch of new material delivered to our house, the tiles and grout and quarts sills and a bit more.
Our garage is/was pretty much full of different materials at this point.
The mason came in and removed some bricks around the window.
Unfortunately they aren't going to be able to match the brick exactly because our brick is so odd looking and not standard at all. We actually hate the brick that we have but theres nothing we can do about that. We had the option for our General contractor to do a wood frame and filler under the window in the space where the old brick was removed, which would no doubt look better than miss matched brick, but since it's at the back of the house I care less about the look and more about the function of that space. I think brick would be more durable with less maintenance over time and likely less chance of water leakage than wood would be. So the builders are going to be filling in the empty space with brick that won't match the existing at all and may look a little odd in the end. I'll keep you posted on that as it goes.
A week or so later they installed the window itself.
That was a nice thing to have completed finally.
They put down new sub flooring in the kitchen and bathrooms for the tile to sit on.
The tiles that we chose for the floors in the kitchen and one of the bathrooms are a 60cm × 60cm (24"x24") square tiles that are a very light grey color.
We only had a few days to see them before they were all covered up by a protective cardboard and wood overlay.
Above is the kitchen pantry. It now has a light installed inside and a pocket door. Exciting.
They also installed the wall accent tiles in both bathrooms. As you can see the two bathrooms are very different from each other, basically polar opposites.
The shower was a bit of a hiccup for me, nothing major but not ideal in my mind. We chose a reeded tile accent in the shower for the back wall with the plan for it to carry on to the side about 25-30%. However, the size of the main dark tiles 60cm × 122cm (24" x 48") created a slight problem for the spacing ratios and we had to make a choice between adding an extra layer of reeded tiles or removing a layer to make it fit properly. If we removed a layer we would only have a small strip of reeded on the side so we chose to add a layer, which makes it's take up a little under half of the sidewall, roughly 40%.
It's hard to visualize these things without seeing them so we chose the option to add a layer. When I first saw it it didn't look right to me, but we had made the choice and have to live with it so, I tried not to dwell on it too hard. We went back to the house the next day and saw it again with the grout completed (not shown) and it looks a lot better to me now. Maybe my brain just moved to the acceptance stage quickly to save me from self torment. Either way I'm happy with it now.
The last thing this week to discuss was the cabinets being delivered. They are supposed to be starting their installation this week on Thursday and Friday and then continuing into next week, so that's pretty exciting.
Note: I started writing this post last Wednesday and then when we checked the house again on Friday we saw that the cabinets had not been started. That was mildly disappointing because we were hoping to see them installed. The project is still on schedule so it's not a big deal, it's just much funner when you see progress being made on the project.
But that is it. That is where we are at in the renovation. There are still 5 more weeks to go and quite a bit left to do but once the cabinets get installed things are going to look a lot different.
Bloody hell, it's really coming together. I like the black bathroom. That's where you can cut up the bodies 😀😀
Lol that would fit the dark and moody theme 😂
I have to dig up the underground tube where the rain gutter pours into on the garage side of the house. Not a big deal, really. Fixed the other three already. But it's hot!
Way to make me feel like a female dog.
I'm not doing this work myself. We hired professionals. This is way beyond my capabilities. So you're doing more than I am 😆
Exciting stuff. Looks good. We've been at it over a year now and she's already shopping for another one.
Projects take a lot of time and generally are ongoing with home ownership. I can understand stand the feeling of "well we're all finished here, let's move on to the next home." 😆
Excited for the final product of this home renovation project! ☺️
There's still a ways to go but we are getting there. 5 more weeks to go
The renovations take time and give the impression that they advance very slowly, gradually everything is taking shape and you can visualize the changes, the porcelain tile in the bathroom looks spectacular.
Have a great week!
Yeah it's taken quite a long time. We are lucky that it's still on schedule. Most people I talk to had their projects go on for weeks or even months longer than originally planned.
It must be a difficult remodeling job with so many things. I really liked the bathroom tiles, they look like black marble.
I think it's going to look really nice in the end.
Yeah it's all coming together slowly. I believe the black tiles are porcelain but made to look like soap stone.
Wowww
Very soon, your house will be looking like a palace. The glow up is really crazy. I’m sure you just have spent a lot of money. Looks beautiful though. I love it!
I'm not sure what you mean by "glow up" but everything is coming a long. Just a little over a month left.
Construction processes at home are always endless, we have to be aware of many issues: we have to become designers, contractors, investors, quality auditors 😅. But the important thing is that everything is turning out beautifully, so congratulations to you!
Yes that's very true, we do have to take on many roles for the project. It's both fun and nerve racking 😆
👏 Keep Up the good work on Hive ♦️ 👏
❤️ @bhattg suggested sagarkothari88 to upvote your post ❤️
🙏 Don't forget to Support Back 🙏
Thanks for the support!
@leaky20, you are most welcome!
Please Support Back
Here is !ALIVE token gift for you
Here is !LUV token gift for you
Here is !PIZZA token gift for you
Here is !BEER token gift for you
Congratulations dear @leaky20! We are delighted to inform you that your outstanding publication was specially selected as an exclusive feature for our Curated Content Catalog and was awarded the BRONZE STAR in Architecture Anthology™ 75. More power!
Thank you for subscribing to Architecture+Design, an OCD incubated community on the Hive Blockchain.