Ahh many things were added, when we were there 2018 the tiles that cover the ground below not yet finished. Then at the left side of the temple there was a bouldozer lifting the soil.
You are viewing a single comment's thread from:
Ahh many things were added, when we were there 2018 the tiles that cover the ground below not yet finished. Then at the left side of the temple there was a bouldozer lifting the soil.
It's done now and I liked the panoramic view of cebu city from the balcony.