Architecture + Design: Filling the strip foundation and its maintenance

in Architecture+Design3 years ago

Architecture + Design: Filling the strip foundation and its maintenance.

Greetings friends!

It's time to tell about the momentous moment when I saw the strip foundation of my house.

In my previous posts in the Architecture + Design community, you can see all the stages of construction that preceded this moment.

I had two options for pouring the foundation, preparing concrete on site or ordering it from the factory and delivering it to the site with mixers.

Considering that the labor hours and the laboriousness of this task would override the logistics costs for me, I decided to stay on the second option and, on the appointed day, the mixers poured concrete into the formwork.

DSC05470.JPG

I remember this day well, for it happened the day after my wife's birthday.

You can say from the ball to the ship).

This was preceded by an outdoor barbecue.

DSC05465.JPG

Another point why I ordered ready-made concrete is that it is possible to pour the entire volume of concrete and, using a concrete vibrator, expel all airiness from the concrete.

I took a concrete vibrator at a construction tool rental, it was more profitable than buying one.

The machine you see in the photos is ideal for work on all construction sites and in hard-to-reach places.

The long pin allowed the concrete to vibrate to a depth of 4 meters when it touched the columns.

The relatively light body made it possible to work at high heights, holding it with one hand.

20160715_122052.jpg

Here you can see the name and characteristics of the concrete vibrator, which I can recommend for its performance.

20160715_122032.jpg

This is what the strip foundation looked like before the concrete mixers reached my plot of land.

20160714_165318.jpg

Precision fit of the formwork ensures the ideal surface of the future foundation.

This is what often kept me awake, I was very worried about the accuracy of the calculations.

DSC05464.JPG

Each column received a pinch point and now the house can grow up.

DSC05466.JPG

This site is one of the most critical. Here the foundations of the house and the basement will be joined together.

DSC05476.JPG

It's hard to imagine how it will be. while you are looking at a sheet of paper with blueprints, I am talking about a person who is not an expert in construction work.

DSC05478.JPG

Guess where the barrel of pickles will be in my basement).

DSC05479.JPG

By that time, a real watchman settled on my site, who did not let anyone close to the building materials.

DSC05498.JPG

Yes, while still, building materials were stored just under the sun, they had to be protected from greedy glances.

DSC05503.JPG

If you noticed, the title of this post talks about strip foundation maintenance.

What kind of service?

Why service it and how to do it?

The fact is that, under the scorching sun, chemical processes occurring in concrete can stop rapidly and unevenly.

This can lead to cracking of the foundation, the concrete will tear and crumble, like a dry loaf.

In order for the concrete hardening processes to proceed slowly and evenly, it is necessary to water the strip foundation with water.

DSC05508.JPG

I took care of this in advance, if you remember my post about the installation of communications on my site.

DSC05512.JPG

Every day, 21 days in a row, after pouring concrete into the formwork, I came and watered the foundation with water in the morning and in the evening.

As a result, in a month. when we moved on to the next stage of construction, I did not find any cracks on the surface of the foundation.

DSC05509.JPG

The only thing that saddened me then was that the corn, on the opposite side of the road from my house, was still taller than my house.)

But this is fixable.

DSC05407.JPG

To be continued.

Photos taken with a Sony Cyber-shot DSC-HX300 camera
I edited a photo in the program PhotoDirector, which I also installed on my smartphone.

Author @barski
Ukraine

For my publications, I do not use stock photographs, it is fundamentally important for me to use photographs that I have made with my own hands for publication and I can name them - authorial work.

You can go to our blog on the Hive platform by clicking on the bee.

bEEEEEEE.jpg

Sort:  

Greetings @barski. Looks like the construction development of your residential project has been moving forward smoothly. Well done! With this latest update on the strip foundations, it’s critical to allow the concrete aspects to cure and settle down properly for stability. It’s also an advantage that a real watchman is finally on site to secure the building materials from losses and damages. How long have you projected to complete the structural framework/skeleton of your house?

Thank you very much, if you mean the full stage of construction of the foundation, together with the basement, it took 4 months since each stage took 21-26 days and there were some delays due to the fact that the builders who worked on my object, had to finish some work on the object of another customer, which they had before me.

And if we talk about the frame of the whole house. then this is a difficult question, which rests only on the financial part. But in general, earlier, according to all norms, construction had to be carried out for at least five years, so that the house would have time to give a full subsidence into the ground and allowed the floors to be poured on the first floor.

There are options to speed up the process, but I have no opportunity to rush so much). Blessed day to you!

Great work on your house construction! Because you’re not in a hurry with your building process, the overall quality of the structural framework of the entire house is key. And your efforts will last you for many generations ahead. Keep up the excellent endeavor and happy Thursday!

 3 years ago  

Well done @barski! We're happy to inform you that this publication was specially curated and awarded RUNNER-UP in Architecture Brew #35. Congratulations!

AB CURATION BANNER - RUNNER-UP - NEW.jpg

Subscribe to Architecture+Design, an OCD incubated community on the Hive blockchain.

Oh wow that is definitely a different way to building and I would love to see the finished construction. Well done on sharing such a wonderful post. I love how it is all cut into the land scape. It will provide protection and ensure longevity.

Thank you for sharing.

Thank you so much for your comment! I am glad it is pleasing to your eyes. Have a great day!

Hello @barski I greet you from Venezuela. Extraordinary, I love the progress they have made in the work. Thank you for sharing that wonderful experience with us. Greetings and infinite blessings. Go ahead, you will soon enjoy a dream come true. I congratulate you. Receive a strong virtual hug full of positive energy and lots of light.

Hola @barski Te saludo desde Venezuela. Extraordinario, me encanta el avance que han tenido en la obra. Gracias por compartir con nosotros esa maravillosa experiencia. Saludos y bendiciones infinitas. Adelante que pronto disfrutará de un sueño hecho realidad. Lo Felicito. Reciba un fuerte abrazo virtual cargado de energía positiva y mucha luz.

Thank you so much for your comment! Have a great day!