You are viewing a single comment's thread from:

RE: LeoThread 2024-09-21 06:33

The Oahu KES site first went operational in January, and Tesla Senior VP of Powertrain and Energy Engineering Drew Baglino visited the BESS to celebrate its Comercial Operation Date (COD).

“Stopped by to congratulate the local team on the successful COD of the 185MW Hawaiian Electric Tesla Megapack installation on Oahu today,” Baglino wrote in a post on X.

The final shipment of coal to the Oahu coal plant took place in September 2022, as was highlighted in a post from Tesla CEO Elon Musk.

The video also comes as the latest of Tesla’s efforts to create educational advertising material it shares on its various social media platforms. Although much of the company’s advertising team was reportedly affected by widespread layoffs in April, Tesla has continued to roll out educational ads both for its energy products and its electric vehicles (EVs).