Part 5/10:
Before commencing the actual replacement, significant preparation was necessary to manage the water around the broken gate. Large diesel pumps were deployed to drain the area strategically, allowing access to the old mechanisms. The old infrastructure was carefully dismantled, with clear attention paid to safety as all components, from drive shafts to support beams, were removed. Each step was coordinated while ensuring that pedestrian access was minimally disrupted, which is critical given the River Walk's popularity.