You are viewing a single comment's thread from:

RE: LeoThread 2025-01-05 02:39

in LeoFinance5 days ago

Part 6/8:

A major challenge faced during the build involved addressing the light leakage from the power station, which glowed noticeably during the evening. The solution was to construct a removable frame that would allow airflow while minimizing visibility of the power source. Experimentation with draft excluders appeared to be a practical, efficient choice to eliminate unnecessary light spillage.

With a mix of trial and error, creativity bloomed in problem-solving. While maintaining the structure's integrity, the project also looked forward to a clean aesthetic.

Final Touches and Reflections