Let's get a new kitchen...Honey said

in #diy7 years ago

white-and-bright-diy-kitchen-makeover-home-improvement-kitchen-backsplash-kitchen-cabinets.jpg

Me and my wife we finally decided to upgrade our kitchen after owning a house for 4 years... In the beginning it was supposed to be a quick cabinet refacing and new countertops...nothing crazy.
After some thinking and figuring things out, we decided that we need more countertop space but our problem was that the existing kitchen was only 12'x 7'...not much room to play considering that we had all those appliances plus we wanted to add dishwasher which would take away our cabinet space.....we needed more room...
Next to our old kitchen we had this old boiler/heater room filled with old pipes, wires and who knows what else. It was a decent size space, about 10'x 20' (definitely bigger than our kitchen). The problem was where could we move all this stuff?...20150415_085610.jpg20150415_085617.jpg20150409_200438.jpg
So I went shopping...and what's better place for shopping than Google and Amazon... after looking at new heaters and boilers I honestly didn't know what to pick or buy... I just knew that I needed that space.
Now we are looking at pretty serious kitchen flip.
Our budget was about 30k more less, and the plan was to do it all by ourselves.
Two weeks later...we had a plan, Honey said "Let's just do it ", and the we started....20150324_051551.jpg
Of course some serious planning...

Then there was demo. Demo took me over one week with cabinet removal, some drywall and floors. Worst part was 10" thick poured concrete wall between our old kitchen and boiler room...yeah poured concrete, but nothing was impossible, we got that done.

Once we were "done" with demo, construction process begun.
20150429_213517.jpg
I had to get steel "I" beams to support the concrete wall that i just took out...
Beams were designed by me , ordered online at NewAgeIronwork.com - shipped within 5 days... everything was a perfect fit.
20150429_213502.jpg

20150429_213447.jpg

Next step, figuring out electrical and plumbing... so old boiler and heater had to go somewhere else and had to be replaced with something smaller but yet powerful to accommodate our needs... we went with Navien brand.20151024_130751.jpg20151121_184653.jpg20151121_184653.jpg
Navien NCB 240 ordered at wholesalewarehouse.net
Plumbin parts ordered at supplyhouse.com
Installation of new heater/boiler took two weeks total of my life as this was my first ever plumbing project on this scale... this is when YouTube came in handy( I'm a carpenter fyi )

So with new heater/boiler we decided to remove all old piping and replace it with new...20150514_182154-1.jpg20150506_173541-1.jpg20150506_173535-1.jpg
Plus we added radiant heat on the first floor where the new kitchen was about be...20150430_152634-1.jpg20150430_155918.jpg
Then dinning room...20150522_233926.jpg20150522_233917.jpg
Then second floor...20150502_135312.jpg20150513_193516.jpg
yes we had to remove all ceilings in order to install radiant heat on second floor...20150513_193521.jpg
Radiant heat parts, manifolds ordered at Supplyhouse.com

Next step was framing and drywal...20150510_135915.jpg
20150502_140010.jpg

Then more plumping and electrical..20150503_213914-1.jpg
20150502_135928.jpg
Electrical supply eg. wires, boxes connectors etc. ordered at Supplyhouse.com

After that taping and priming the walls..20150506_173550.jpg

New floors...20150528_101334.jpg
Floors White Thasso 1'x2' ordered at HomeDepot.com

Then best part...cabinets 20150913_170453-1.jpg20150601_102808.jpg
Cabinets ordered at wholesalecabinets.us (they come in well packed boxes the only thing is that you have to put them together) great prices!

After cabinets we were ready for appliances 20150914_184928.jpg
And countertops!20150709_221933.jpg
Countertops measured and cut by our local Marble/Granit shop ( the only thing that wasnt ordered online!!!)
Some wall wrap and new fireplace20150714_115115.jpg

20150913_170433.jpg
Stone ordered at njgravelsand.com
Fireplace at Amazon.com

And finally after 3 months of labor we came up with this...!

20170626_200641.jpg

20170626_200701.jpg

20170626_200720.jpg

20170626_200845.jpg

20170626_200543.jpg

20170626_200608.jpg

20170626_200429.jpg

20170626_200453.jpg

So from quick cabinet refacing we went to full blown half a house renovation...
99% of materials used on this kitchen were ordered online (except the countertop) and 100% or work/labor was done by me and my wife.
I hope u guys like what you see and if you have any questions on materials used in this project, please leave a comment below and I'll be more than happy to answer them all...

Sort:  

Impressive change. How much does such a renovation cost (without work), judging from the kitchen style, America? From where I come from the kitchen is the most expensive thing to renovate after the bathroom. Probably the same thing there.

Yes it was expensive. Total in materials about 40k, the fact that i did it myself, i saved about another 40-60k in labor...and yes its New York USA.
As far as bathrooms they are pricey too, depends on style and materials used.

Oh wow. That is a lot. Hopefully it translates into value for the house.

after appraisal it came out to about 150% in return. wasn't too bad... :)

Your post is very good, I like it and I think other people too so. Thank you for sharing. I will always follow you, upvote and maybe i will resteem
Upvote your post. Hopefully what I do you will also do in my post, best regards steemit always.

Thanks a lot for comment, i will check out your posts

Love it. Looks like glass tile for the backsplash behind sink?

Anyway, you did an amazing job.

Yes its a glass tile all around with decor tile by the stove.